CLIENT NAME: Enbridge

PROJECT NAME: Edmonton to Hardisty Project

LOCATION: Sherwood Park, AB

SCOPE: 39,000m of NPS 36

PEAK PERSONNEL: 400

Spread 1 of the Edmonton to Hardisty Project was completed during the summer and fall construction season of 2014 with crews based on the east side of Sherwood Park.


Construction of the NPS 36 pipeline included more than 312 road, creek, pipeline, railway and utility crossings in and around the congested Transportation Utility Corridor and through semi-urban lands in the Sherwood Park area. More than 127 wetlands were crossed using a combination of open cut and horizontal bores in order to minimize disturbance to the local environment. Mechanized welding was used on the project with semi-automatic welding for tie-ins where possible.

Contact Surerus:

HEAD OFFICE: 250.785.2423
ALBERTA OPERATIONS: 403.930.1358

For General Inquiries:This email address is being protected from spambots. You need JavaScript enabled to view it.

FULL CONTACT INFO & MAP

linkedinsymbol

googlepluslogo

complyworksISN LOGOcorcwb certISO bW