CLIENT NAME: Pembina

PROJECT NAME: Namao to Redwater Fractionation and Storage Pipeline Project

LOCATION: Edmonton, AB

SCOPE: 27,000m of NPS 24, 27,000m of NPS 16, 3600m of dual NPS 16

PEAK PERSONNEL: 330

Surerus was selected to install 27,000m of NPS 24 and NPS 16 steel pipe in a common trench during the summer and fall of 2015. The scope of work also included the fabrication and installation of 3 valve riser sites, 4 pig receivers and launchers along with the installation of the pipeline across the Sturgeon River via an open cut method.